enquiries@stopford.co.uk +44(0) 151 357 7740

FEED Study and EPCC for Metal Recovery from Waste Electronics Plant

Image of waste electronics

FEED Study and EPCC for Metal Recovery from Waste Electronics Plant

Stopford has undertaken a FEED study for the design of a process to recovery metal from end of life waste electronics equipment. As well as process design work, Stopford also executed numerous laboratory scale studies to optimise the novel chemical extraction process. Upon successful completion of this FEED study, Stopford was then contracted to carry out the Engineering, Procurement and Construction (EPCC) for a pilot plant facility.

Project Details

Related Projects


View project

FEED Study for a Small Hydroelectric Power Station

FEED Study for a Small Hydroelectric Power Station

View project

Design of an International Airport Fuel Terminal

Design of an International Airport Fuel Terminal

View project

Engineering Design for Nine Bioethanol Storage & Blending Facilities

Engineering Design for Nine Bioethanol Storage & Blending Facilities

Scroll to Top